COMPLETED PROJECTS YEAR 2005    

 


YEAR
CLIENT
  PROJECT
   
2005
BREDERO SHAW (M) S/B
 
Denso cold wrape for bends and linds and line pipe project.

2005

BREDERO SHAW (M) S/B

 

Installation anode pipe 24” od fbe pipes x 76mm thick concrete  or shakalin 1 phase 1 dev. Offshore project.

2005

BREDERO SHAW (M) S/B

 

Procurement, supply and fabrication of the applicable accesaries and installation of cathodic protection system for pipe 48” od fbe pipes x 100mm & 756mm, 12” od fbe pipes x 25mm thick concrete for shakalin 1 (d.e.t)  project.

2005

BREDERO SHAW (M) S/B

 

Fabrication and installation of anode and other applicable attachmentfor pipe od 323.9mm (pp 35mm), 273.1mm (ae 4.5mm), 169.3mm(ae 4.5mm) for rang dong project.

2005

BREDERO SHAW (M) S/B

 

Fabrication of the accessaries and installation anode pipe od of fbe coated pipes 24” x 76mm thick. Concr. & pipe 36” x 64mm thick. Concr.for shakalin 1 phase 1 dev. Offshore project.

2005

BREDERO SHAW (M) S/B

 

Procurement, supply of the accessaries and installation anode od pipes 508mm(ae5.5mm),90mm&60mm conc. Thick., 219.1mm (ae 5.5mm),75mm conc. Thick., supply welding inspector, & arrange for mechanical test for samarang pipeline project.

2005

BREDERO SHAW (M) S/B

 

Installation of cathodic protection system for pipe od 508mm, 5.5mm ae, 6mm cncr. Thck.for samarang project.

2005

PPSC INDUSTRIES S/B

 

Installation anode pipe od 30”,40mm&60mm, pipe 14”,40mm&80mm, pipe 10”, 40mm for shakalin 2 phase 2  project.

2005

EMEPMI/ PPSC INDUSTRIES S/B

 

Blast & apply heat shrink sleeves on bend pipes for emepmi project.

2005

PPSC INDUSTRIES S/B/SAIPEM

 

Preparation of welding procedure specification(wps), coordinate the arrangement for third party mechanical testing for shakalin 2 phases 2 project.

2005

PPSC INDUSTRIES S/B//SAIPEM

 

Preparation of wps,procedures, and other applicable documentation for installation of doubler plates for 4.5” pe coating type for shakalin offshore project.

2005

PPSC INDUSTRIES S/B/SAIPEM

 

Coordinate the preparation and arrangement of welding procedure qualification inclusive of arrangement with 3rd party company and other associated documentation for the cathodic protection system (retrofit) for shakalin 2 phase 2 project.

2005

PPSC /SAIPEM

 

Anode installation for shakalin 2 phase 2 (pipe 10”).

2005

PPSC / PETRONAS CARIGALI SDN BHD

 

Blasting & application of heat shrink sleeve on bend pipe for baram south project.

2005

PPSC / EMEPMI

 

Blasting & Application of heat shrink sleeve on 6 joints of bends (various size) for CSEA-tap pipeline project.

2005

PPSC / PETRONAS CARIGALI SDN BHD

 

Anode installation sacrificial project for baram south.

2005

BREDERO SHAW / BRUNEI SHELL BERHAD

 

Fabrication and installation of anode for 28” e8dra-e11pb & e11pb-e11vb project ae & 3lpp pipes.

2005

BREDERO SHAW

 

Concrete removal & retrofiting of 68 joints 28” cwc pipe for e8dra-e11pb & e11pb-e11vb project.

2005

BREDERO SHAW / HONG KONG GAS Ltd.

 

Blasting to sa 2.5 and perform cold wrapping (denso) tape on bend and line pipe.

2005

BREDERO SHAW / JAPAN VIETNAM PETROLEUM
Co. Ltd.

 

Fabrication of the attachment, installation of anode installation for rang dong.

2005

BREDERO SHAW / JAPAN VIETNAM PETROLEUM
Co. Ltd.

 

Fabrication and anode installation for shakalin i epcs 2 project.

2005

PPSC / SAIPEM UK Ltd.

 

Installation of cathodic protection system for shakalin (pipe bundle strapping).

2005

PPSC / SUMITOMO

 

Pipe end on site machining for 13” crome, 6” od line pipe end preparation: quantity 700 ends (internal boring).

2005

BREDERO SHAW / HONG KONG GAS Ltd.

 

Fabrication of the attachment and accesaries for anode installation for lamma project.

2005

SUMATEC CORPORATION SDN.BHD

 

Procurement, fabrication,  installation, testing and commisioning of 2 unit of steel structure workshops for
East coast regional workshops (ecro)

2005

BREDERO SHAW / UNUCAL THAILAND Ltd.

 

Anode installation for yala khapong trunkline project.

2005

PPSC / PETRONAS CARIGALI SDN BHD.

 

Anode installation for ledang anoa development project.

2005

BREDERO SHAW / EXXONMOBIL EXPLORATION
AND PRODUCTION MALAYSIA INC. (EMEPMI).

 

Anode installation seligi a-tapis p, tabu a – guntong e, tabu b – tabu a.

2005

PPSC / BRUNEI SHELL PETROLEUM

 

Anode installation champion south east phase II project.


 
Copyright © RWNA ENGINEERING SDN BHD 2007. All Rights Reserved
 