YEAR |
CLIENT |
|
PROJECT |
|
|
|
|
2007 |
PPSC / CHINESE PETROLEUM CORPORATION. |
|
Anode installation for TTT project. |
2007 |
BREDERO SHAW(M) SDN. BHD. / SARAWAK SHELL |
|
Anode installation for f13 shallow clastic pipeline & bends. |
2007 |
PPSC / SARAWAK SHELL |
|
Anode instalation 20inch for carbonate gas pipeline project. |
2007 |
BREDERO SHAW(M) SDN. BHD. / SARAWAK SHELL |
|
Anode installation for f13w – e11 pb 28inch carbonate gas pipeline project. |
2007 |
PPSC / THAI OIL |
|
Application of liquid epoxy coating on 52” od bend pipe for thai oil project. |
2007 |
PPSC / PETRONAS CARIGALI |
|
To perform circumferental cold cutting and bevelling for api 5l pipe size 20” od and 26” od line pipe. |
2007 |
MPE LINDUNG SDN. BHD |
|
Rental of equipment, tools and preparation for welder qualification test(wps 502) emepmi – anode core. |
2007 |
MPE LINDUNG SDN. BHD |
|
To perform blasting works of anode core to sa2.5 at rwna yard. |
2007 |
PPSC / THAI OIL |
|
Supply manpower, equipment, material and consumable for the packing and transportation of 52” liquid epoxy coated bends. |
2007 |
PPSC / PETRONAS CARIGALI |
|
Anode installation for sumandak phase 2 project. |
2007 |
PPSC / PETRONAS CARIGALI |
|
To perform double jointing works for pipe size 4” dia. Of 6m length to 12m length inclusive of pipe end bevelling, cold cutting and the required radiograpy test for sumandak phase 2 project. |
2007 |
PPSC / PETRONAS CARIGALI |
|
Application of heat shrink sleeve (wcp 100) for 41 nos of bends ( 4 inch OD to 16 inch OD) for Sumandak phase 2 project. |
2007 |
PPSC / PETRONAS CARIGALI |
|
Application of glass flake coating for sumandak phase 2 project. |
2007 |
PPSC / CARIGALI HESS SDN BHD |
|
Anode installation for bumi. Bulan & suriya gas field dev. Project. |
2007 |
BREDERO SHAW (M) SDN. BHD. / NEWFIELD |
|
Application of 3.1 coat sestem for epc of topside and jacket of east west belumut a – platform . |
2007 |
BREDERO SHAW (M) SDN. BHD / BRUNEI SHELL PETROLEUM |
|
Anode installation for east west pipeline replacement project, east west pipeline replacement project, mampak field development project, seria north flank development project. |
2007 |
BREDERO SHAW (M) SDN. BHD / TALISMAN ORKID |
|
Anode installation for pm3 caa northern field development project. |
2007 |
BREDERO SHAW (M) SDN. BHD / SARAWAK SHELL BERHAD |
|
Anode installation for g7/ms3 subsea development project |
2007 |
TRENERGY FPSO / PETRONAS CARIGALI |
|
Term contract (1 year + 1 year – 2007/2008 construction / maintenance work of fpso perintis) -to perform blasting and primer. |
2007 |
TRENERGY FPSO / PETRONAS CARIGALI |
|
Term contract (1 year + 1 year – 2007/2008 construction / maintenance work of fpso perintis) -to provide manpower, equipment, tools and consumables for fabrication of pipe spools (onshore). |
2007 |
TRENERGY FPSO / PETRONAS CARIGALI |
|
Term contract (1 year + 1 year – 2007/2008 construction / maintenance work of fpso perintis) -to supply manpower, tools and consumables to perform blasting & primer and pipe bend. |
2007 |
TRENERGY FPSO / PETRONAS CARIGALI |
|
Term contract (1 year + 1 year – 2007/2008 construction / maintenance work of fpso perintis) –site survey & stringing and preparation of new and demolition drawing. |
2007 |
TRENERGY FPSO / PETRONAS CARIGALI |
|
To supply manpower, equipment tools and consumables for perintis shutdown 2007. |
2007 |
BREDERO SHAW (M) SDN. BHD / PETRONAS
CARI GALI. |
|
Anode installation for betty revisit field development project. |
2007 |
BREDERO SHAW (M) SDN. BHD / PETRONAS
CARI GALI. |
|
Anode installation for puteri field development project. |
2007 |
BREDERO SHAW (M) SDN. BHD / PETRONAS
CARI GALI. |
|
Anode installation for angsi-d satellite drilling platform, associated pipeline & andp-d host tie-in at angsi-a complex project. |
2007 |
BREDERO SHAW (M) SDN. BHD / CHEVRON
OFFSHORE (THAILAND) LIMITED. |
|
Anode installation for stage 4 cbd whp-gulf of thailand project. |
2007 |
PPSC / PETRONAS CARI GALI. |
|
Anode installation for kikeh pipelines project. |