YEAR |
CLIENT |
|
PROJECT |
|
BREDERO PRICE/ PETRONAS CARIGALI SDN. BHD.
|
|
Welding of marker welds of 24” od api 5l x65, 20mm thickness pipe, double plate, insert and cadweld and other associated works for andra-a to seligi-a project. Codes & standards: api 1104 18th. Edition. |
2001
|
PPSC/ PHILLIPS PETROLEUM PTY LTD. |
|
Preparation & arrangement of wps, wpqr, wqt & wqr for carbon steel plate material astm a283 to api 5l x65 linepipe for Bayu-undan gas recycle project. Codes & standards: aws d1.1.
|
2001
|
PPSC/ PETRONAS CARIGALI SDN. BHD. |
|
Welding of markerweld on the linepipe for Angsi develop
Project. |
2002 |
PPSC |
|
Fabrication and installation of framing safety posters.
|
2003 |
PPSC |
|
Fabrication and installation of framing safety posters. |
2002-2003 |
PPSC/ PETRONAS CARIGALI SDN. BHD |
|
Welding of astm a-36 to jis g 3101 ss400 material & thermit welding and other associated works for linepipe of br-b to rdp-a for resak project. Codes
& standards: aws d1.1
|
2003 |
PPSC |
|
To design, supply, fabricate, install and commission a hydraulic clamp and its associated accessories for Libya gas transmission system (LGTS) project.
|
2003 |
ALPHA SEJATI |
|
Repair cargo ship steel floor at pelabuhan Kuantan.
|
2004 |
PPSC INDUSTRIES S/B |
|
To fabricate and install d. Plate for 4.5 pipes coated with pe for shakalin 2 phase 2 project
|
2004 |
PPSC INDUSTRIES S/B |
|
Design,procurement,fabrication and installation of hydraulic clamping equipment for the installation of anodes, infilling of anode gaps on pipes already cwc, re-fitting of anodes due to misalignment of anode inserts for shakalin project. |
2004 |
SAIPEM/PPSC INDUSTRIES S/B |
|
Fabrication, installation, testing and commissioning of system 2 hydraulic jack system for aoe installation for shakalin ii phase 2 project
|
2004 |
PPSC INDUSTRIES S/B |
|
Fabrication and installation of pipeline attachments and anode installation anode id 605mm, pipe coating 3lpp for bongkot project.
|
2004 |
BREDERO SHAW (M) S/B |
|
Installation of caging/reinforce steel around the coated pipe for ruby and shallow clastic project
|
2004 |
BREDERO SHAW (M) S/B |
|
nondestructive testing for high strength steel pipe for shenzen project.Mechanical testing (destructive testing) and dye penetrate test and other applicable
|
2005 |
PPSC INDUSTRIES S/B/SAIPEM |
|
Preparation of welding procedure specification (wps), coordinate the arrangement for third party mechanical testing for shakalin 2 phases 2 project.
|
2005 |
BREDERO SHAW (M) S/B |
|
Procurement, supply and fabrication of the applicable accesaries and installation of cathodic protection system for pipe 48” od fbe pipes x 100mm & 756mm, 12” od fbe pipes x 25mm thick concrete for shakalin 1 (d.e.t) project.
|
2005 |
SUMATEC ENGINEERING & CONSRUCTION
SDN BHD |
|
Kemaman bitumen project. (AOC pipe lines and supply & construction, testing and commissioning of holding basin) |
2005 |
SUMATEC ENGINEERING & CONSRUCTION
SDN BHD |
|
Kemaman bitumen refinery project. (Supply, fabrication, tie in, testing and commissioning of coc pipe, trench, sand bedding, backfilling and reinstatement works)
|
2005 |
BREDERO SHAW / JAPAN VIETNAM PETROLEUM
Co. Ltd. |
|
Fabrication of the attachment, installation of anode installation for rang dong. |
2005 |
BREDERO SHAW / JAPAN VIETNAM PETROLEUM
Co. Ltd. |
|
Fabrication and anode installation for shakalin i epcs 2 project. |
2005 |
SUMATEC CORPORATION SDN.BHD |
|
Procurement, fabrication, installation, testing and commisioning of 2 unit of steel structure workshops for
East coast regional workshops (ecro) |
2006 |
M3NERGY/ PETRONAS CARIGALI |
|
Servicing of pressure safety relief valve for deck boiler
|
|
M3NERGY/ PETRONAS CARIGALI |
|
Chemical cleaning & hydrotest of hydraulic piping. |
2006 |
PPSC INDUSTRIES |
|
Longitudinal buttering of 24” od pipelines project. |
2006 |
TRENERGY FPSO/ PETRONAS CARIGALI |
|
Servicing of 12” glove valve Project. |
2006 |
BREDERO SHAW / BSM MIDDLE EAST(DUBAI) |
|
Fabrication, installation, testing and commissioning of pu spacers. |
2006 |
BREDERO SHAW / BSM MIDDLE EAST(DUBAI) |
|
Fabrication of pipe spool for metering crude oil facilities
|
2006 |
M3NERGY/ PETRONAS CARIGALI |
|
Fabrication of new p-600 discharge line spools for water injection piping |
2006 |
TRENERGY FPSO / PETRONAS CARIGALI |
|
Term contract (1 year + 1 year – 2007/2008 construction / maintenance work of fpso perintis) -to perform blasting and primer. |
2007 |
TRENERGY FPSO / PETRONAS CARIGALI |
|
Term contract (1 year + 1 year – 2007/2008 construction / maintenance work of fpso perintis) -to provide manpower, equipment, tools and consumables for fabrication of pipe spools (onshore). |
2007 |
TRENERGY FPSO / PETRONAS CARIGALI |
|
Term contract (1 year + 1 year – 2007/2008 construction / maintenance work of fpso perintis) -to supply manpower, tools and consumables to perform blasting & primer and pipe bend. |
2007 |
TRENERGY FPSO / PETRONAS CARIGALI |
|
TRENERGY FPSO / PETRONAS CARIGALI |
2007 |
TRENERGY FPSO / PETRONAS CARIGALI |
|
To supply manpower, equipment tools and consumables for perintis shutdown 2007. |
2008 |
|
|
Various res (pipe extension) MTBE turnaround 2008 |
2008 |
TRINERGY FPSO/PETRONAS CARIGALI |
|
Perintis shutdown 2008 |
2008 |
PETRONAS GAS BERHAD |
|
Installation of ¾ ‘’ methanol injection/ installation of ¾’’ methanol injection carbon steel piping at gpp 5 and gpp 6 |
2008 |
TRENERGY FPSO/PETRONAS CARIGALI
|
|
To fabrication and installation of boiler deck piping |
2008 |
MTBE SDN BHD |
|
Mmsb/ppmsb piping replacement,neutralization line |
2008 |
MTBE SDN BHD |
|
Mmsb/ppmsb piping replacement (utility water line) |
2008 |
DONALDSON FILTRATION (M) SDN. BHD |
|
Installation od chiller to supply material,manpower,equipment and consumable for installation of water chiller for water batch. |
2009 |
MTBE SDN. BHD |
|
MTBE mini shutdown February 2009 |