YEAR |
CLIENT |
|
PROJECT |
2002 |
PPSC (SG. PETANI) |
|
Cold cutting and rebeveling machine |
2002 |
BREDERO PRICE |
|
Linepipe cold cuts & rebevel
|
2003 |
PPSC |
|
On site linepipe cold cut, rebevelle and surface finishing for libya gas transmission system (LGTS) project. |
2003 |
PPSC |
|
On site linepipe cold cut, rebevelle and surface finishing for libya gas transmission system (LGTS) project. |
2003 |
DAYANG ENTERPRISE |
|
On site cold cutting service |
2004 |
PPSC |
|
Pipe repair for carbon steel pipes ( cold cutting and re-beveling & grinding ) |
2004 |
PPSC INDUSTRIES S/B |
|
Removal of concrete coating on pipe od 22”, 3lpp coating, and pipe cold cutting for bongkot project. |
2004 |
PPSC INDUSTRIES S/B |
|
Perform pipe hot cutting mand inspection for epmi du 3289 project |
2004 |
PPSC INDUSTRIES S/B |
|
Cutting & rebevel end damages linepipes use hot cut for epmi project |
2004 |
SAIPEM/PPSC INDUSTRIES S/B |
|
.Pipe bundling strapping, rigging and handling for shakalin project |
2005 |
BREDERO SHAW (M) S/B |
|
Denso cold wrape for bends and linds and line pipe project. |
2005 |
PPSC / SUMITOMO |
|
Pipe end on site machining for 13” crome, 6” od line pipe end preparation: quantity 700 ends (internal boring). |
2006 |
METAL ONE CORP. JAPAN |
|
On site cold cut and pipe machining for 297 jts of 26” od linepipes project. |
2006 |
HSE RESOUCES/PGB |
|
On site piping cold cutting and pipe end machining services at gpp a petronas |
2006 |
TRENERGY FPSO/ PETRONAS CARIGALI |
|
Services & repair of launcher door project. |
2006 |
BROWN & ROOT-CONDOR/PPSC |
|
1600 number of pipe end (one inch internal boring wit 1:4 tapper at the end fpr 6inch and 8 inch stainless steel pipe) on site machining for in-sallah pipeline project. |
2007 |
PPSC / PETRONAS CARIGALI |
|
To perform circumferental cold cutting and bevelling for api 5l pipe size 20” od and 26” od line pipe. |
2007 |
PPSC / PETRONAS CARIGALI |
|
To perform double jointing works for pipe size 4” dia. Of 6m length to 12m length inclusive of pipe end bevelling, cold cutting and the required radiograpy test for sumandak phase 2 project. |
2008 |
NEWWIN SDN. BHD/ PETRONAS GAS BERHAD |
|
Resurface flange face for flange 30’’x |
2008 |
NEWWIN SDN. BHD/ PETRONAS GAS BERHAD |
|
Resurface flange face for flange 8’’x600# |
2008 |
NEWWIN SDN. BHD/ PETRONAS GAS BERHAD |
|
Resurface flange face for flange 10’’x600# |
2008 |
TKE/ PETRONAS GAS BERHAD |
|
Resurface channel head-gasket area partition plate / to remove sludge&resurface shell side |
|
TANJUNG MAINTENANCE SDN BHD/VINYL CHLORIDE (M) SDN BHD @VCMSB |
|
Resurface flange 10’’x600# |
2008 |
STS SDN. BHD/ VCMSB |
|
Resurface flange 10’’x300# |
2008 |
MUSTHARI MAINTENANCE SDN. BHD / ETHYLENE (M) SDN. BHD |
|
Re-surface flange facing at shell side heat exchanger (et-0-e-1184)/ flange facing 8’’x300 (et-0-4-702)/ flange 8x300 (et-0-4-225)/ (e-003)/ flange facing at (et-0-e-851) flange facing at v 601. |
|
|
|
|
|
|
|
|
|
|
|
|