ONSITE MACHINING    

 


YEAR
CLIENT
 
PROJECT
2002
PPSC (SG. PETANI)
 

Cold cutting and rebeveling machine

2002

BREDERO PRICE

 

Linepipe cold cuts & rebevel

 

2003

PPSC

 

On site linepipe cold cut, rebevelle and surface finishing for libya gas transmission system (LGTS) project.

 

2003

PPSC

 

 

On site linepipe cold cut, rebevelle and surface finishing for libya gas transmission system (LGTS) project.

2003

DAYANG ENTERPRISE

 

On site cold cutting service

2004

PPSC

 

Pipe repair for carbon steel pipes ( cold cutting and re-beveling & grinding )

 

2004

PPSC INDUSTRIES S/B

 

Removal of concrete coating on pipe od 22”, 3lpp coating, and pipe cold cutting for bongkot project.

 

2004

PPSC INDUSTRIES S/B

 

Perform pipe hot cutting  mand inspection for  epmi du 3289 project

 

2004

PPSC INDUSTRIES S/B

 

 

Cutting & rebevel end damages linepipes use hot cut for epmi project

2004

SAIPEM/PPSC INDUSTRIES S/B

 

.Pipe bundling strapping, rigging and handling for shakalin project

2005

BREDERO SHAW (M) S/B

 

Denso cold wrape for bends and linds and line pipe project.

 

2005

PPSC / SUMITOMO

 

 

Pipe end on site machining for 13” crome, 6” od line pipe end preparation: quantity 700 ends (internal boring).

2006

METAL ONE CORP. JAPAN

 

 

On site cold cut and pipe machining for 297 jts of 26” od linepipes project.

2006

HSE RESOUCES/PGB

 

 

On site piping cold cutting and pipe end machining services at  gpp a petronas

2006

TRENERGY FPSO/ PETRONAS CARIGALI

 

Services & repair of launcher door project.

 

2006

BROWN & ROOT-CONDOR/PPSC

 

1600 number of pipe end (one inch internal boring wit 1:4 tapper at the end fpr 6inch and 8 inch stainless steel pipe) on site machining for in-sallah pipeline project.

 

2007

PPSC / PETRONAS CARIGALI

 

 

To perform circumferental cold cutting and bevelling for api 5l pipe size 20” od and 26” od line pipe.

2007

PPSC / PETRONAS CARIGALI

 

 

To perform double jointing works for pipe size 4” dia. Of 6m length to 12m length inclusive of pipe end bevelling, cold cutting and the required radiograpy test for sumandak phase 2 project.

2008

NEWWIN SDN. BHD/ PETRONAS GAS BERHAD

 

Resurface flange face for flange 30’’x

2008

NEWWIN SDN. BHD/ PETRONAS GAS BERHAD

 

Resurface flange face for flange 8’’x600#

2008

NEWWIN SDN. BHD/ PETRONAS GAS BERHAD

 

Resurface flange face for flange 10’’x600#

2008

TKE/ PETRONAS GAS BERHAD

 

 

Resurface channel head-gasket area partition plate / to remove sludge&resurface shell side

2008

TANJUNG MAINTENANCE SDN BHD/VINYL CHLORIDE (M) SDN BHD @VCMSB   Resurface  flange 10’’x600#
2008
STS SDN. BHD/ VCMSB   Resurface  flange 10’’x300#
2008
MUSTHARI MAINTENANCE SDN. BHD / ETHYLENE (M) SDN. BHD   Re-surface flange facing at shell side heat exchanger (et-0-e-1184)/ flange facing 8’’x300 (et-0-4-702)/ flange 8x300 (et-0-4-225)/ (e-003)/ flange facing at (et-0-e-851) flange facing at v 601.

 


 

 

 

 

 

 

 

 

 

 


 
Copyright © RWNA ENGINEERING SDN BHD 2007. All Rights Reserved
 